Hi Jack
Thanks for your valuable feedback!
We’ve tested your proposal, but with same result.
Please review steps that were executed in SAP.
We changed the scenario from Shipments (SHPMNT – SHPMNT06) to Deliveries (DESADV – DELVRY03)
(I’m sure your proposal can be applied to both scenarios)
- 1) Create copy of Process code DELV in tcode WE41 (we copied all dependent requirements) and changed radio button to “Processing w. trigger (inbound)”. New process code created: ZDELV
- 2) Add message type “DESADV” with process code “ED08” to Inbound parameters for the current active SAP logical system using WE20. Let’s call it SAP_QAS
- 3) We added the 2 new external systems in Distribution model (BD64) and then generated partner profiles. Let’s call them:
- MES_DEL1
- MES_DEL2
- 4) We then changed Message control for 2x external logical system in WE20 (Outbound parameters):
- MES_DEL1 / E1 / ZMES / ZDELV
- MES_DEL2 / V2 / ZMES / ZDELV
I’m sure the setup in tcode NACE is correct since we’ve tested both [Inbound (E1) and outbound deliveries (V2)] successfully with only one external system in Distribution model.
Best regards
W